LoadMatch


An advanced Green hydronic heating and cooling system that delivers better comfort, lower first costs, lower energy and maintenance costs, lower life cycle costs, and reduced design, start-up, and commissioning time.
Informative videos about the LoadMatch system:
Introduction to LoadMatch – Watch Greg Cunniff explain the principles of the LoadMatch System and why it’s better for today’s energy-conscious customers. Did you know that LoadMatch is considered an integral part of any Green Building design? Watch video

Hydronic System Solutions – With our HSS software, you can design an entire LoadMatch system within 30 minutes. The software is a free download. Watch these helpful videos:
HSS Tutorial and LoadMatch Wizard Tutorial
LoadMatch Green Building compatible system components include:

Sample some LoadMatch installations around the nation:

LoadMatch systems have been installed in hundreds of buildings, saving time, money, and energy. Below is a sample listing. Click on a bullet to download a Hydronic System Solutions (HSS) drawing, read a case study, view a video, or browse a project photo gallery.

An orange bullet denotes a technical journal feature article.

Project Building
Type
Construction
Type
HSS
Drawing
Case
Study
Video Photos
American Can Lofts Housing Mixed Reuse
ABB Manufacturing Manufacturing Retrofit
Ascent at Roebling’s Bridge Housing New Construction
Big Sky Village Center Hotel New Construction
Century Village Assisted Living New Construction
Clackamas Office New Construction
Dolwick Business Ctr Office Retrofit
D’Youville College School Retrofit
Emerald by the Sea Housing New Construction
Forest Dale Home Nursing Home New Construction
Fox Hill Housing New Construction
Hamilton Stores Office Retrofit
Hilton Garden Inn Hotel New Construction
KPMG Case Study #1:
Conquering Humidity in a Tropical Environment
Office New Construction
KPMG Case Study #2:
Achieving Energy Efficiency in a High Cost Energy Environment
Office New Construction
Laketown Wharf Housing New Construction
Las Vegas Surgical Ctr Medical Office New Construction
Maxim Medical Medical Office New Construction
Meeting Street School School New Construction
Project Title Building
Type
Construction
Type
HSS
Drawing
Case
Study
Video Photos
Monaco Hotel Hotel Retrofit
MonteLago Estates Housing New Construction
Mountainview Business Park Office New Construction
Origin at Seahaven Housing New Construction
Proximity Hotel Hotel New Construction
Renaissance Providence Hotel Hotel Retrofit
Raypak Manufacturing Retrofit
Stone Child Community College School New Construction
Taco Factory Manufacturing Retrofit
Taco Toronto Manufacturing Retrofit
Two Bear Ranch Residence New Construction
Waterloo High School School New Construction
Westin Hotel Hotel Retrofit
Whistler Resort Housing New Construction
Whitefish Credit Union Office New Construction
Whitefish Lake Lodge Hotel New Construction
Williston Northampton School Housing Retrofit
Part 1

Part 2

Will Rogers High School School Retrofit
369 Terminal Ave Office New Construction

LoadMatch

Brochures (2)

TitleSheet NumberEffective Date
Loadmatch Brochure100-1307/25/08
Loadmatch Installations100-9.8July 16, 2005
Close

LoadMatch

Case History Brochures (17)

TitleSheet NumberEffective Date
ABB Assembly Facility100-6006/30/08
Century Village Retirement Facility100-4506/05/08
D'Youville College300-2112/06/10
Dolwick Drive Business Center100-4606/11/08
Hamilton Stores100-9.706/11/08
Hilton Garden Inn100-6512/05/08
KPMG Office Building100-6211/01/10
Lois Hole Library300-2405/25/2011
Maxim Medical Center100-7102/12/09
Meeting Street School100-6306/05/08
Monaco Hotel100-1006/11/08
Notes from the Field300-9.701/01/10
Proximity Hotel100-6106/18/08
Stone Child Community College100-4706/11/08
Whistler Resort100-1106/11/08
Will Rogers Elementary School100-6406/19/08
Williston Northampton School100-6602/18/09
Close

LoadMatch

Product Catalogs (2)

TitleSheet NumberEffective Date
Loadmatch Circulators100-9.9January 10, 2008
Loadmatch Twin-Tee100-6.802/12/2016
Close

LoadMatch

Instruction Sheets (3)

TitleSheet NumberEffective Date
LoadMatch Installation Instructions100-7811/25/2009
LoadMatch Cartridge Circulators102-11510/01/10
LoadMatch Twin-Tee102-131
Close

LoadMatch

Submittal Data Sheets (3)

TitleSheet NumberEffective Date
LoadMatch Circulator101-9.901/05/2015
LoadMatch Thermostats101-12612/11/2015
LoadMatch Twin-Tee101-12007/30/2006
Close

LoadMatch

Performance Curves (2)

TitleSheet NumberEffective Date
Load Match 50HZ Curves
Load Match 60HZ Curves
Close

LoadMatch

Specifications (2)

TitleSheet NumberEffective Date
LoadMatch Spec03/10/2016
LoFlo Hydronic Piping03/10/2016
Close
WordPress Video Lightbox